All projects listed were completed by Kevin Pugh as a subcontractor. He was the responsible Authorised Person (AP) and design engineer for the medical gas pipeline systems (MGPS)..
I completed a full compliance check to verify the pipe sizes were correct, using our proprietary software this small project was competed in just one working day.
I completed a small project comprising of three buildings which resulted in very long main pipe runs.
I designed the pipework for the largest of the three buildings for this project the design of the women and children's building included three risers, with a lot of neonatal and oncology beds.
I designed the Surgery centre for the project included over 20 operating theatres and countless post anaesthesia care units.
I designed the smallest building of this 627 bed hospital complex the building included therapy pools and treatment areas.